What project margin means
Project margin is the share of selling price left after the costs included in your calculation. This tool’s target-price mode uses net margin: direct labor plus overhead plus the buffer are deducted from the quote. The retainer view reports gross margin before overhead and net margin after overhead so those measures are not confused.
Suppose delivery labor is $9,600, project overhead is $1,200 and a risk reserve is $800. At a 35% target margin, planned cost is $11,600 and the quote is about $17,846. Planned profit is about $6,246; markup on cost is about 53.8%.
Why an extra hour matters
Unbilled work is still a real cost. If a team’s loaded labor cost is $65 per hour, 18 extra hours consume $1,170 of potential profit. This does not mean every hour should be billed separately; it gives you a concrete basis to review scope, process or pricing.
Inputs to check before quoting
- Use a loaded rate that includes the employer’s payroll burden and benefits.
- Include project-specific costs, but avoid counting shared overhead twice.
- Make clear whether a contingency is a reserve, a cost estimate or a fee added to the quote.
- Compare the estimate with actual hours after delivery and update future quotes.